Chapter 3 – Part four: A central metropolitan block

The network grid: 337

 Novermber 1963    The Buchanan Report    Chapter 3iv  
Contents  Chapter 3iv  The network grid

The network grid

337

In this example, seeing that the emphasis to some extent lay on preservation, we decided to adopt the larger network grid which would surround rather than divide the West End. This, of course, reduced the capacity of the network and hence the maximum permissible traffic generation by the study area to 10,200 p.c.u./hour (Figure 175 and Table 9, Grid D).